\\ Bridge Rehabilitation/Replacement
Construction Inspection for Bridge Rehabilitation/Replacement in Westchester County
The work on this project involves replacing and repairing bridge decks, structural bearings, and installing new watermain pipes at multiple sites. Each site includes specific tasks like steel support installation, concrete repairs, and traffic control measures to minimize disruption. The project also involves aesthetic enhancements and utility relocations to ensure the bridges meet modern standards and safety requirements.
Key Features:
- Replacement of concrete bridge decks and structural bearings
- Installation of 12-inch ductile iron watermain pipes with steel supports
- Steel girder paint abatement and application of new coatings
- Staged replacement of bridges and abutments
- Relocation of fiber optic, electrical, and utility lines
- Rehabilitation of four-span bridges, including concrete deck and girder repairs
- Implementation of traffic control devices for lane closures
- Long-term staged closures to complete work